Preparation of the Transmission System Master Plan (TSMP) of NEPAL: The main purpose and primary objective of the Transmission System Master Plan is to provide a transmission system development plan covering 2013 to 2030 that will optimize projected load flows within Nepal and between Nepal and India in a manner that is safe, respects agreed reliability criteria, is technically efficient and least cost to Nepal. To be more specific, transmission line have been the limiting factor in the development of hydro power plant in Nepal. To evacuate the power generated from the upcoming hydro power plants, the development of adequate transmission system has become essential.