The objective of the Project was to improve the operation and reliability of the T & D Power System of Monrovia and to increase the access to electricity in and around Monrovia by providing technical assistance to LEC. The two components of this project are: • Greater Monrovia Transmission Reinforcement Project – identification of the reinforcement needed in 66 kV transmission network till 2030. This activity was presented in the report called “Monrovia Power System Assessment Report”; • Distribution extension at 22 kV and Consumer Connection 0.4 kV - to connect a total of 58,180 customers and 23 large consumers with an approximated total power of 18,050 kVA - will be done only for Monrovia area