E
AETS was responsible for carrying out a financial and economic cost-benefit analysis (CBA) of the proposed electricity transmission networks Control Centre of Middle Delta area, one of the most populated of Egypt. The client is EDF-CIST and the beneficiary is the national EETC company responsible for the development and operation of transport networks of all of Egypt. The economic and financial analysis has been performed according to the general principles required by the International Financing Institutions (in this case the AFD, French Development Agency) in order to assess the “bankability” of the project.

Projects
Energy and Infrastructures

All projects